Given a rate of 99% defective erected new buildings is the force in Germany and 5-year warranty period in Area of \u200b\u200bthe building is a recognized standard for decades. Defects in new buildings are often visible only after years. The current decreased in the EC discussed the draft directive, the warranty period of two years. The distribution of liability between the different producers rested with builders hard:
Whether a water damage was caused by the use of false material or by the faulty installation, experts provide regular fixed during the court proceedings. But the builder must specify in advance the future even if he sued the producers of the damaged material, or the craftsman, he will be burdened with de facto research for the cause of the error.